Ningbo Zhoushan Port Meishan Port Area Berth 9-12 Yard Project

Project NameNingbo Zhoushan Port Meishan Port Area Berth 9-12 Yard Project
Project LocationMeishan, ChinaEngineering Costs16 million yuan
Start timeDecember 3th, 2021Completion timeOctober 25th, 2022
CompanyName
Owner

Ningbo Branch of CCCC Third Harbor Engineering Co.,Ltd.

DesignCCCC Water Transportation Consultants Co., Ltd.
SupervisoryNingbo Port Project Management Co., Ltd.
Project Overview

The high-strength interlocking block with a strength of C50 and a thickness of 100mm has a laying area of 196 thousand square meters. The supply period is 8 months. The supplier is responsible for transporting to the designated location, and the purchaser is responsible for unloading. The monthly supply area is 35000 square meters, and the annual supply area is required to reach 350000 square meters. The quantity is randomly sampled on site, and the qualification rate is required to be 100%.

Ningbo Zhoushan Port Meishan Port Area Berth 9-12 Yard ProjectNingbo Zhoushan Port Meishan Port Area Berth 9-12 Yard ProjectNingbo Zhoushan Port Meishan Port Area Berth 9-12 Yard Project