Project Name | Zhejiang Yuhuan Kanmen Central Fishing Port Breakwater Project--Anti-Taiwanese Repair Project | ||
Project Location | Zhejiang, China | Engineering Costs | 12 million yuan |
Start time | November, 2002 | Completion time | June, 2003 |
Company | Name | ||
Owner | Yuhuan County Kanmen Center Fishing Port Engineering Command | ||
Design | Chinese Academy of Fishery Sciences | ||
Supervisory | Shanghai Donghua Supervision Co., Ltd. | ||
Project Overview | |||
Yuhuan Kanmen Central Fishing Port project was damaged by "Senlac" super typhoon before completion. The outer slope of the armor block is damaged and the embankment was broken to form a gap, which must be fully repaired before the arrival of the next typhoon season. 12T, 9T accropodes prefabrication, 6T, 4.5T dolosse prefabrication, original broken block cleaning, dry masonry slope protection, large volume concrete wave wall pouring. The total length of the dike is 900 meters. The dike body is treated with explosive silt squeezing. |
Ningbo Xiaolang Construction Engineering Co., Ltd.
Ningbo Tianyuan Cement Products Co., Ltd.
Yuehu Ginza, Nanzhan East Road, Haishu District, Ningbo City
+86 574 8698 8331
315012
Copyright © Ningbo Tianyuan Construction Engineering Co., LTD All Rights Reserved | Sitemap