Project Name | Shandong Longkou West Coast Artificial Island Perimeter Diking Project | ||
Project Location | Longkou, Shandong, China | Engineering Costs | 75 million yuan |
Start time | March 8, 2011 | Completion time | November 31, 2011 |
Company | Name | ||
Owner | Shandong Longkou Nanshan Group | ||
Design | CCCC Shanghai Waterway Consulting Co. Ltd. | ||
Supervisory | Tianjin Tianke Engineering Management Co., Ltd. | ||
Project Overview | |||
The project is the largest offshore artificial island group under construction in China. This project plans to build six offshore artificial islands and a piered artificial island, with a total planned land area of 44.29 square kilometers, including a reclamation area of 35.23 square kilometers, requiring about 500 million cubic meters of earth and rock handling. Prefabricated and installed 5t concrete accropodes 52,000 pieces, 2t concrete accropodes 4,800 pieces, the total volume is about 120,000 cubic meters, the concrete standard is C35, anti-freeze index F300, the installation is planned to be discharged at fixed points on the water, and randomly placed at fixed points underwater. The construction period is 8 months. |
Ningbo Xiaolang Construction Engineering Co., Ltd.
Ningbo Tianyuan Cement Products Co., Ltd.
Yuehu Ginza, Nanzhan East Road, Haishu District, Ningbo City
+86 574 8698 8331
315012
Copyright © Ningbo Tianyuan Construction Engineering Co., LTD All Rights Reserved | Sitemap