Project Name | Jintang Port Area Taipukou Container Terminal Project Stage II Embankment and Land Formation Works | ||
Project Location | Zhoushan, China | Engineering Costs | About 55 million yuan |
Start time | June, 2014 | Completion time | December, 2016 |
Company | Name | ||
Owner | Zhoushan Yongzhou Container Terminal Co., Ltd | ||
Design | CCCC Shanghai Waterway Survey and Design Institute | ||
Supervisory | Ningbo Port Engineering Project Management Co., Ltd | ||
Project Overview | |||
The new embankment is 1,158 m in length, with a riprap structure, 2T accropodes revetment, and a reinforced concrete wave breakwater protecting surface of the top of the embankment with slurry masonry blocks wrapped around it, with a sand-filled pipe bag anti-filtration layer inside. The dike is filled with 1.8 million m³ of blown sand, forming a land area of 261,000 ㎡. |
Ningbo Xiaolang Construction Engineering Co., Ltd.
Ningbo Tianyuan Cement Products Co., Ltd.
Yuehu Ginza, Nanzhan East Road, Haishu District, Ningbo City
+86 574 8698 8331
315012
Copyright © Ningbo Tianyuan Construction Engineering Co., LTD All Rights Reserved | Sitemap