Project Name | Marine Ecological Protection and Restoration Project on Meizhou Island, Putian City | ||
Project Location | Putian, Fujian, China | Engineering Costs | 225.133 million yuan |
Start time | May 1, 2024 | Completion time | January 2025 |
Company | Name | ||
Owner | Putian Meizhou Island Tourism Construction Group Co., Ltd. | ||
Design | East China Survey and Design Institute Co., Ltd. | ||
Supervisory | Fujian Jinyu Construction Engineering Co., Ltd. | ||
Project Overview | |||
The main construction content of the damaged shoreline natural restoration project is the Lianchi restoration section in the eastern part of Meizhou Island and the Shanwei restoration section in the western part. The total length of natural restoration is about 616m, of which the Lianchi section has a restoration length of 253 and the Shanwei section has a restoration length of 363m. The project type is an integrated EPC project of design, construction, and procurement. The total estimated investment for the project is approximately 225.133 million yuan. Prefabricated installation of 1,929 units of C30 10t concrete Accropode blocks and 384 units of 15t concrete Accropode blocks, installed randomly at designated locations; 76,482 units of C25 concrete mattresses. The total volume of precast concrete is 15,000 m³. The construction period is 300 days. |
Ningbo Xiaolang Construction Engineering Co., Ltd.
Ningbo Tianyuan Cement Products Co., Ltd.
Yuehu Ginza, Nanzhan East Road, Haishu District, Ningbo City
+86 574 8698 8331
315012
Copyright © Ningbo Tianyuan Construction Engineering Co., LTD All Rights Reserved | Sitemap