| Project Name | Nanhui Dongtan Promoting Siltation and Reclamation Phase II Project Section 5 | ||
| Project Location | Shanghai, China | Engineering Costs | 18.76 million yuan |
| Start time | October, 2000 | Completion time | May, 2001 |
| Company | Name | ||
| Owner | Shanghai Land Making Co., Ltd. | ||
| Design | Shanghai Water Engineering Design and Research Institute | ||
| Supervisory | Shanghai Hongbo Engineering Supervision Co., Ltd. | ||
| Project Overview | |||
The Shanghai Government has implemented a major measure of reclaiming land from the sea and increasing land reserves, covering an area of 50000 acres. The length of this section is 4 kilometers, and the embankment body adopts a PHC pipe pile and riprap mesh cage block stone structure. The foundation is laid with high-strength base cloth and gravel cushion. | |||
Ningbo Xiaolang Construction Engineering Co., Ltd.
Ningbo Tianyuan Cement Products Co., Ltd.
Yuehu Ginza, Nanzhan East Road, Haishu District, Ningbo City
+86 574 8698 8331
315012
Copyright © Ningbo Tianyuan Construction Engineering Co., LTD All Rights Reserved | Sitemap