Nanhui Dongtan Promoting Siltation and Reclamation Phase IV Project Section 1

Project NameNanhui Dongtan Promoting Siltation and Reclamation Phase IV Project Section 1
Project LocationShanghai, ChinaEngineering Costs17.0202 million yuan
Start timeSeptember, 2003Completion timeDecember, 2004
CompanyName
Owner

Shanghai Land Making Co., Ltd.

DesignShanghai Water Engineering Design and Research Institute
SupervisoryShanghai Hongbo Engineering Supervision Co., Ltd.
Project Overview

The Shanghai Government has implemented a major measure of reclaiming land from the sea and increasing land reserves, covering an area of 50000 acres.

The design standard for the levee is based on a 200-year return period and the addition of a Category 12 typhoon. The levee body is constructed using mud filled pipe bags, with a bottom width of 120 meters, a top width of 8 meters, and a height of 9 meters. The seaward side is equipped with grouted block stones and a wave barrier board protective structure. The top of the levee is paved with asphalt, and the inner slope is covered with green grass.