Project Name | Port Accropodes Prefabrication Project of Shandong Rongcheng Xinhong Phase IV | ||
Project Location | Shandong, China | Engineering Costs | 4.05 million yuan |
Start time | September, 2021 | Completion time | September, 2022 |
Company | Name | ||
Owner | CUD(WEIHAI)SHIPYARD CO.,LTD. | ||
Design | Tianjin Harbor Design and Research Institute | ||
Supervisory | Guangdong Technology Venture Capital Co., Ltd. | ||
Project Overview | |||
This project is constructed according to the accropode drawings provided by the owner; The prefabrication site, C30F250 concrete, and transportation in the construction are all provided by the owner. A total of 10000 pieces of 10T accropodes and 1500 pieces of 14T accropodes are prefabricated, with a total construction period of 204 days. A total of 83 sets of 10T and 23 sets of 14T of steel molds are invested. |
Ningbo Xiaolang Construction Engineering Co., Ltd.
Ningbo Tianyuan Cement Products Co., Ltd.
Yuehu Ginza, Nanzhan East Road, Haishu District, Ningbo City
+86 574 8698 8331
315012
Copyright © Ningbo Tianyuan Construction Engineering Co., LTD All Rights Reserved | Sitemap