Project Name | Wenzhou Dongtou Dongsha Port Restoration Project Labor Subcontracting Project | ||
Project Location | Wenzhou, China | Engineering Costs | 1.39 million |
Start time | March 12, 2014 | Completion time | July 31, 2014 |
Company | Name | ||
Owner | Dongtou Marine Fisheries Bureau | ||
Design | CCCC First Harbor Consultants Co., Ltd. | ||
Supervisory | Tianjin Tianke Engineering Management Co., Ltd. | ||
General Contractor | Ningbo Port Harbor Engineering Co., Ltd. | ||
Project Overview | |||
Dongsha Port breakwater project is located between Dongtou Gongwei and Dawangdian, the breakwater is 350 meters long. Firstly, 100 blocks of 17-ton accropodes were supplemented at the missing part of the armor blocks, and the whole line of armor blocks were adjusted and supplemented to be installed to meet the original design requirements. Secondly, the road up the embankment was hardened and a gate platform was set to prevent the embankment from being encroached upon by farmers and other people, which will affect the daily maintenance management. The total contract price is 1.79 million and the construction period is 2.5 months. |
Ningbo Xiaolang Construction Engineering Co., Ltd.
Ningbo Tianyuan Cement Products Co., Ltd.
Yuehu Ginza, Nanzhan East Road, Haishu District, Ningbo City
+86 574 8698 8331
315012
Copyright © Ningbo Tianyuan Construction Engineering Co., LTD All Rights Reserved | Sitemap