Home >> Projects

Section 8 of Nanhui Dongtan Sedimentation Promotion and Reclamation Phase I Project

Project NameSection 8 of Nanhui Dongtan Sedimentation Promotion and Reclamation Phase I Project
Project LocationShanghai, ChinaEngineering Costs17.0202 million yuan
Start timeNovember, 1999Completion timeJuly, 2000
CompanyName
Owner

Shanghai Dongfang mudflat Land Co., Ltd

DesignShanghai Water Engineering Design and Research Institute
SupervisoryShanghai Hongbo Engineering Supervision Co., Ltd.
Project Overview

The Shanghai Government has implemented a major measure of reclaiming land from the sea and increasing land reserves, covering an area of 50000 acres.

The length of this section is 5 kilometers, and the embankment body adopts a riprap mesh cage block stone structure. The foundation is laid with high-strength base cloth of 560000 square meters, and the sea riprap is 85000 cubic meters.



Contact Us

Ningbo Xiaolang Construction Engineering Co., Ltd.
Ningbo Tianyuan Cement Products Co., Ltd.