Project NameThe Interlocking Blocks Project in Ningbo Daxie International Container Terminal Yard
Project LocationNingbo, ChinaEngineering Costs65 million yuan
Start timeSeptember, 2004Completion timeJuly, 2007
CompanyName
Owner

Ningbo Daxie Investment Promotion International Terminal Co., Ltd.

DesignCCCC Third Harbor Consultants Co., Ltd.
SupervisoryShenzhen Haiqin Engineering Supervision Company
Project Overview

The Daxie Investment Promotion International Terminal project is jointly invested and constructed by Hong Kong Investment Promotion International, Ningbo Port Authority, and CITIC Corporation, with a total investment of 5 billion yuan. The terminal has a coastline of 1,200 meters, four berths, and a storage area of approximately 1 million square meters..

The contract section has completed a storage yard of 300,000 square meters, with a structure of graded crushed stone, cement stabilized layer and concrete surface layer. The yard is equipped with reinforced concrete drainage ditches, cable trenches, and rainwater drainage pipes. C50 high-strength interlocking blocks with a thickness of 10 centimeters are laid in the container yard, with a total of 7 million interlocking blocks produced.


The Interlocking Blocks Project in Ningbo Daxie International Container Terminal YardThe Interlocking Blocks Project in Ningbo Daxie International Container Terminal Yard

The Interlocking Blocks Project in Ningbo Daxie International Container Terminal YardThe Interlocking Blocks Project in Ningbo Daxie International Container Terminal YardThe Interlocking Blocks Project in Ningbo Daxie International Container Terminal Yard

Contact Us

Ningbo Xiaolang Construction Engineering Co., Ltd.
Ningbo Tianyuan Cement Products Co., Ltd.